
Green Building Store’s PERFORMANCE triple glazed timber windows and doors – in bespoke shapes and sizes – chosen for a low energy selfbuild project in Wiltshire.
Green Building Store’s PERFORMANCE triple glazed timber windows and doors – in bespoke shapes and sizes – chosen for a low energy selfbuild project in Wiltshire.
Low energy selfbuild project designed by Architect Philip Wright in an arc shape. Green Building Store supplied the PERFORMANCE triple glazed timber windows, entrance doors and tilt and slide doors and designed the MVHR heat recovery ventilation system at the project.
Newbuild 5-storey block of flats on the site of Cartyne Parish Church in Glasgow, aiming for Passivhaus certification. Green Building Store’s ULTRA triple glazed timber windows and doors were specified for the project.
Newbuild Devon house in green oak frame, aiming for high levels of energy efficiency and designed using PHPP (Passivhaus Planning Package). Green Building Store’s MVHR system and ULTRA triple glazed timber windows and doors were chosen for the project, which was also supported by Green Building Store’s consultancy service.
Case study on the radical retrofit of a 1930s ex-council house in Manchester, resulting in EnerPHit (the Passivhaus standard for retrofits) certification. Green Building Store designed the MVHR system and supplied the ULTRA triple glazed timber windows and entrance doors for the project.
Case study on Passivhaus newbuild 2 bedroom house built in a conservation area in Powys. Green Building Store supplied the PROGRESSION triple glazed windows, ULTRA Contemporary doors, MVHR system and Pro Clima airtightness products for the project.
Green Building Store’s triple glazed PERFORMANCE timber windows and doors were specified for the Cuerden Valley Park Visitor Centre. Built entirely out of natural materials, the Centre is a hybrid straw bale building, part loadbearing and part timber frame.
Green Building Store’s PROGRESSION triple glazed timber windows & doors and PAUL Novus 300 MVHR system were specified for project designed by Architype built on the site of an old barn within the clients’ Herefordshire garden.
Green Building Store’s triple glazed timber windows and doors and MVHR heat recovery ventilation system, as well as building and consultancy services, chosen for Yorkshire farmhouse radical retrofit.
Award-winning energy efficient newbuild house, built into a steeply sloping Sheffield garden site. Green Building Store supplied the PERFORMANCE triple glazed windows & doors and MVHR system for the project.